File info

When a .3hm file is opened, the menu option File > File Info is enabled. By this option the user can get additional information about the file such as the creation date and time, file description, work breakdown structure, field type, and the field maximum length.

This information is presented in the File Info dialog which has three tab options (see examples below).

You can sort the columns of WBS and DBase or change their order.